Actions

Difference between revisions of "Development"

From SharedSkies

 
(29 intermediate revisions by 2 users not shown)
Line 1: Line 1:
As of August 10, 2010, this is the "to do" list for the Shared Skies project.
+
This is the "to do" list for the Shared Skies project.
 +
 
 +
Last update:  January 1, 2018
  
  
 
== Mt. Kent ==
 
== Mt. Kent ==
  
Safety review for Mt. Kent staff
+
'''Tasks'''
 +
 
 +
Complete environmental links to allow safe remote operation.
 +
 
 +
Implement astrometry-based guiding on CDK20S and CDK700.
 +
 
 +
Build web-based remote control or monitoring software.
 +
 
 +
 
 +
'''Notes'''
 +
 
 +
Minerva South or Minerva Australis construction is complete.  Shared Skies is  independent of Minerva.
 +
 
 +
 
 +
 
 +
== Moore ==
 +
 
 +
 
 +
'''Tasks'''
 +
 
 +
Make FSQN or another telescope available to students on line
 +
 
 +
Implement Galil controller as an option for MORC to allow absolute encoding
 +
 
 +
Remove droplines and replace with wireless or contact based dome interface on CDK20N and MORC
 +
 
 +
Exterior painting in spring 2018
 +
 
 +
Upgrade fiber to 1 Mb/s planned for early 2018
 +
 
 +
 
 +
 
 +
'''Notes'''
 +
 
 +
Roll roof motor relays replaced and interlocks rewired in preparation for remote operations.
 +
 
 +
 
 +
== Mt. Lemmon ==
 +
 
 +
Replace filter wheel on the ULMT telescope with a more reliable wheel
 +
 
 +
Add Linux VM to the control system options
 +
 
 +
Add a small formfactor CPU at the telescope to reduce cable lengths
 +
 
 +
 
 +
 
 +
== Software ==
 +
 
 +
 
 +
'''Remote'''
 +
 
 +
Integrate systems with web interface for remote operation
 +
 
 +
Complete scheduler software to connect to remote operations
 +
 
 +
 
 +
 
 +
'''XmTel'''
 +
 
 +
Add hand paddle control to Galil systems
  
Safety upgrades to EDG building roof access
+
Update for MORC24  including use of absolute encoders
  
All-sky camera installation on EDG building roof platform
 
  
Diagnosis and repair of site camera's sticky iris
 
  
Receipt of shipment of equipment for CDK20S
+
'''XmCCD'''
  
Installation of new autoguider on CDK20S
+
Fix issues with region selection
  
Installation of Wacom field camera on CDK20S
+
Update SBIG library when libraries are available
  
Installation of U16M and IFW filter wheel on CDK20S
 
  
Repair of weather station's serial interface
+
'''Linux'''
  
Suse 11.2 installation on Mt. Kent 1
+
Systematically update OS's to latest Opensuse releases
  
Work on refurbishments of dome for CDK700 (target October 2010)
+
Add Linux VM  at ULMT

Latest revision as of 08:51, 1 January 2018

This is the "to do" list for the Shared Skies project.

Last update: January 1, 2018


Mt. Kent

Tasks

Complete environmental links to allow safe remote operation.

Implement astrometry-based guiding on CDK20S and CDK700.

Build web-based remote control or monitoring software.


Notes

Minerva South or Minerva Australis construction is complete. Shared Skies is independent of Minerva.


Moore

Tasks

Make FSQN or another telescope available to students on line

Implement Galil controller as an option for MORC to allow absolute encoding

Remove droplines and replace with wireless or contact based dome interface on CDK20N and MORC

Exterior painting in spring 2018

Upgrade fiber to 1 Mb/s planned for early 2018


Notes

Roll roof motor relays replaced and interlocks rewired in preparation for remote operations.


Mt. Lemmon

Replace filter wheel on the ULMT telescope with a more reliable wheel

Add Linux VM to the control system options

Add a small formfactor CPU at the telescope to reduce cable lengths


Software

Remote

Integrate systems with web interface for remote operation

Complete scheduler software to connect to remote operations


XmTel

Add hand paddle control to Galil systems

Update for MORC24 including use of absolute encoders


XmCCD

Fix issues with region selection

Update SBIG library when libraries are available


Linux

Systematically update OS's to latest Opensuse releases

Add Linux VM at ULMT