Difference between revisions of "Development"
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
This is the "to do" list for the Shared Skies project. | This is the "to do" list for the Shared Skies project. | ||
Last update: | Last update: January 1, 2018 | ||
Line 8: | Line 8: | ||
'''Tasks''' | '''Tasks''' | ||
Complete environmental links to allow safe remote operation. | |||
Implement astrometry-based guiding on CDK20S and CDK700. | |||
Build web-based remote control or monitoring software. | |||
'''Notes''' | |||
Minerva South or Minerva Australis construction is complete. Shared Skies is independent of Minerva. | |||
== Moore == | == Moore == | ||
Line 30: | Line 26: | ||
'''Tasks''' | '''Tasks''' | ||
Make FSQN or another telescope available to students on line | |||
Implement Galil controller as an option for MORC to allow absolute encoding | |||
Remove droplines and replace with wireless or contact based dome interface on CDK20N and MORC | |||
Exterior painting in spring 2018 | |||
Upgrade fiber to 1 Mb/s planned for early 2018 | |||
'''Notes''' | |||
Roll roof motor relays replaced and interlocks rewired in preparation for remote operations. | |||
== Mt. Lemmon == | |||
Replace filter wheel on the ULMT telescope with a more reliable wheel | |||
Add Linux VM to the control system options | |||
Add a small formfactor CPU at the telescope to reduce cable lengths | |||
== Software == | == Software == | ||
Line 59: | Line 59: | ||
Integrate systems with web interface for remote operation | Integrate systems with web interface for remote operation | ||
Complete scheduler software to connect to remote operations | |||
'''XmTel''' | '''XmTel''' | ||
Add hand paddle control to Galil systems | |||
Update for MORC24 including use of absolute encoders | |||
Line 71: | Line 74: | ||
'''XmCCD''' | '''XmCCD''' | ||
Update | Fix issues with region selection | ||
Update SBIG library when libraries are available | |||
'''Linux''' | |||
Systematically update OS's to latest Opensuse releases | |||
Add | Add Linux VM at ULMT |
Latest revision as of 08:51, 1 January 2018
This is the "to do" list for the Shared Skies project.
Last update: January 1, 2018
Mt. Kent
Tasks
Complete environmental links to allow safe remote operation.
Implement astrometry-based guiding on CDK20S and CDK700.
Build web-based remote control or monitoring software.
Notes
Minerva South or Minerva Australis construction is complete. Shared Skies is independent of Minerva.
Moore
Tasks
Make FSQN or another telescope available to students on line
Implement Galil controller as an option for MORC to allow absolute encoding
Remove droplines and replace with wireless or contact based dome interface on CDK20N and MORC
Exterior painting in spring 2018
Upgrade fiber to 1 Mb/s planned for early 2018
Notes
Roll roof motor relays replaced and interlocks rewired in preparation for remote operations.
Mt. Lemmon
Replace filter wheel on the ULMT telescope with a more reliable wheel
Add Linux VM to the control system options
Add a small formfactor CPU at the telescope to reduce cable lengths
Software
Remote
Integrate systems with web interface for remote operation
Complete scheduler software to connect to remote operations
XmTel
Add hand paddle control to Galil systems
Update for MORC24 including use of absolute encoders
XmCCD
Fix issues with region selection
Update SBIG library when libraries are available
Linux
Systematically update OS's to latest Opensuse releases
Add Linux VM at ULMT