This is the "to do" list for the Shared Skies project.
Last update: January 1, 2018
Mt. Kent
Tasks
Complete environmental links to allow safe remote operation.
Implement astrometry-based guiding on CDK20S and CDK700.
Build web-based remote control or monitoring software.
Notes
Minerva South or Minerva Australis construction is complete. Shared Skies is independent of Minerva.
Moore
Tasks
Make FSQN or another telescope available to students on line
Implement Galil controller as an option for MORC to allow absolute encoding
Remove droplines and replace with wireless or contact based dome interface on CDK20N and MORC
Exterior painting in spring 2018
Upgrade fiber to 1 Mb/s planned for early 2018
Notes
Roll roof motor relays replaced and interlocks rewired in preparation for remote operations.
Software
Remote
Integrate systems with web interface for remote operation
Complete scheduler software to connect to remote operations
XmTel
Add hand paddle control to Galil systems
Update for MORC24 including use of absolute encoders
XmCCD
Fix issues with region selection
Update SBIG library when libraries are available