Development
This is the "to do" list for the Shared Skies project.
Last update: June 2, 2011
Mt. Kent
Tasks
All-sky camera the on EDG building roof platform
Repair of site camera's sticky iris
Test new XmTel and XmCCD versions at night
Receipt of shipment of equipment for CDK20S (awaits shipment from US)
Installation of Wacom field camera on CDK20S
Installation of U16M and IFW filter wheel on CDK20S
Install new rain monitor
Clean optics
Install new servers at Mt. Kent
Work on refurbishments of dome for CDK700 (target August 2011 for CDK700 installation in September)
Replace CDK20S mount with A200HR (September 2011)
Notes
Shipment of parts to Mt. Kent
Delivery date on CDK700 is September 2011
New rain monitors are installed at Moore and will be shipped to Mt. Kent
Moore
Tasks
Test Manta video from CDK125 for live planetary imaging (current)
Develop Planewave A200HR software on CDK20N
Install Apogee U16M and IFW filterwheels on CDK20N with new mount
Complete software pipeline for remote/autonomous operation of CDK20 photometry
Complete web interface for remote operation of CDK20's (prototype by August 2011)
Install new control for CDK125 focus and temperature using Galil RIO
Connect rain monitor on Sirius dome to remote operations control
Clean optics (August 2011)
Design, build, and install remotely operated mirror covers (late 2011)
Test small and large echelles with RC24 (summer 2011)
Ship completed small echelle to Mt. Kent for use with CDK700 (August 2011)
Notes
Roll roof remote operation requires wiring limit switches.
Software
XmDome
Dome on CDK20S points incorrectly around zenith
There are some places where dome partly obscures scope
Tests needed for discontinuity in mapping telescope pointing to dome azimuth, possibly causing unexpected dome slews
XmTel
Focus readout in xmtel not working on CDK20S (possibly corrected in lastest XmTel build for CDK20S)